Cologne Cathedral, before we start
A bishop's church in a city that threw its bishop out
Stand back for a second and look up. About a hundred and fifty-seven metres of dark stone. For four years after it was finished, nothing humans had built anywhere was taller.
But this hill was holy long before the towers. Cologne was a Roman city, and Christians were meeting here by the early three hundreds. Church after church rose on this same spot. So when the people of Cologne began this one in 1248, they weren't founding anything. They were upgrading.
And they upgraded with ambition. Around 1200, Cologne had about forty thousand people. That put it level with London and Paris. It sat on the Rhine, where goods moved between northern Italy and England, and its merchants got rich on that traffic. A city like that wanted a church to match. So the builders looked to France, to the newest and boldest Gothic of the day. The floor plan follows Amiens Cathedral closely. The ceiling almost reaches the height of Beauvais. This is French ambition, built in German stone.
Keep reading
Officially, this is Saint Peter's, the seat of the Archbishop of Cologne. In the Middle Ages that was one of the most powerful men in the Holy Roman Empire. He was one of the seven princes who elected the emperor. Here's the contradiction. In 1288 the citizens of Cologne fought their own archbishop, beat him, and took him prisoner. From then on, the city more or less ran itself. Archbishops were usually not even allowed inside the walls. Later they made Bonn their capital. So the greatest bishop's church in Germany stood for centuries in a city that kept its bishop at arm's length.
You'll meet the forces that made this place along the way: relics, a lost plan, war, and a stone workshop that never stops.
One last thing. Around six million people a year come through these doors, and nearly all of them are tourists. Keeping the building standing costs about forty-four thousand euros a day. So since July 2026, sightseers pay twelve euros to get in. Praying is still free. So is lighting a candle. Seven and a half centuries in, the bills are still coming. Let's go in.

The route
13 stops, one story
Find out how a delivery of relics started it all, how a lost medieval plan turned up in an attic, why a random generator filled a window, and why nobody plans to scrub the black stone clean.
- 1
Cologne Cathedral, before we start
For four years after its completion, nothing humans had built anywhere was taller. Its floor plan, though, was borrowed almost entirely from a French cathedral at Amiens.
Read it above ↑ - 2
The Relics That Made a Cathedral (1164 to 1248)
Pilgrims pressed small badges against the skulls of the Three Kings, though the Bible never calls them kings. A fire in 1248 changed what stood around them.
- 3
The Shrine of the Three Kings
To keep it from being seized, a man in Frankfurt had it declared property of the French Republic. In the Second World War, a bunker door near Siegen proved too narrow for it.
- 4
A Lost Plan and a Finished Cathedral (1814 to 1880)
Ordinary citizens paid a large share of the bill to finish a medieval building. Theodor Fontane wrote a poem for the celebration that carried an unexpected note of doubt.
- 5
The Gero Cross
Archbishop Gero's gift is nearly three centuries older than the cathedral and is the first large crucifix to survive since antiquity. Not every later improvement was kind to it.
- 6
Lochner's Altarpiece and the Hidden Synagogue
Cologne expelled its Jews in 1424, and the council's chapel rose on the synagogue site. In 2025 the artist Andrea Büttner was chosen to make a new work above this altar.
- 7
Richter's Window of Chance
Cardinal Meisner opposed the 72-colour window, and the cathedral chapter approved it anyway. A word he used in a sermon that same year carried a heavy Nazi-era history.
- 8
Dicker Pitter, the Great Bell
Konrad Adenauer co-signed the letter asking for its bronze. The man who took the casting commission died before the bell ever left his foundry in Apolda.
- 9
How the Cathedral Survived the War
About seventy bombs hit the cathedral, but planning for its protection had begun in 1936. The last visible war damage was repaired only in 2005.
- 10
The Never-Finished Cathedral
Stone and the Dombauhütte
Replacement stone now comes from a quarry at Montemerlo in Italy, and new finials are still set with molten lead. About seventy people work in the cathedral's workshops.
- 11
Under the Floor
The Old Cathedral and the Dig
The very first trench of a 1946 dig struck the Old Cathedral's western apse. In 1959, two Frankish princely graves turned up beneath the choir.
- 12
The Choir Stalls
Where the Chapter Sat (1308 to 1311)
Tree rings date the timber to between 1308 and 1311, while the choir was still unfinished. Under each tip-up seat sits a small ledge named after mercy.
- 13
The Empty Niche
Werner of Oberwesel and the St Michael Portal
Werner of Oberwesel once sat over this doorway with a basket of grapes at his feet. A plaster model of him survives, and in 2023 the Metropolitan Chapter made its decision.
Hear all 13 stops in the app
The app plays every stop, shows where you are on the map and answers your questions on the way. Free to start your first tour.
Keep exploring
More guides in Cologne
FAQ
Questions about this guide
Where does the Cologne Cathedral: Six Hundred Years Behind Schedule audio guide start?
At Cologne Cathedral, before we start, in Cologne. From there the app takes you from stop to stop with GPS.
How many stops are there?
13 stops: Cologne Cathedral, before we start, The Relics That Made a Cathedral (1164 to 1248), The Shrine of the Three Kings and 10 more. The first one is free to read on this page.
Does it work offline?
Yes. Download the guide and its audio over Wi-Fi, then use it outdoors with GPS without spending mobile data.
Is it free?
The GuideSofia app is free to download, and it's free to start your first tour.
Which language is it in?
This page is in en-US. In the app, the guide is narrated in 30+ languages.
Can I ask the guide questions?
Yes. Open the chat in the app and ask about what you are looking at, local history, food or nearby places.